FS50 CURTAIN WALL

01/05/2025

FS 50 – FS 60 CURTAIN WALL

FS 50 curtain wall system with higher seismic performance provides high flexibility and strength to distinctive buildings and meets the requirements of modern building construction and architecture.FS50 CURTAIN WALL

FS 60 is one of Kleidco’s systems, providing a whole package façade solution for the project’s demands.

The Kleidco Façade system FS 60 offers a high degree of flexibility allowing attractive design options for façades. FS50 CURTAIN WALL

About the structural performance, Kleidco systems ensure high-performance values in terms of air permeability, water tightness and wind pressure as well as the Uf. FS50 CURTAIN WALL

Technical Specifications

System Visible Width 60 mm
   
Mullion Depth 60-200 mm
Mullion Inertia Jx 52-1063 cm4
Jy 32-111 cm4
Transom Depth 65-205 mm
Transom Interia Jx 39-601 cm4
Jy 26-70 cm4
Glazing Thickness 6-42 mm
Max. Sash Height 2500 mm
Max. Sash Weight 180 kg

FS50-FS60
FS50-FS60 Detail

Performance Values

EN 12152 Air Permeability Class A4 (±600 Pa)
EN 12154 Water Tightness RE 900 (900 Pa)
EN 13830 Wind Load Resistance ±2100 Pa
EN 13830 Safety Wind Load Resistance ±3000 Pa
EN 14019 Impact Resistance Class E5
EN 10.077-2 Thermal Insulation Uf: 1,46 W/m².K
corner 2
corner
fs 50 opening types
FS 50 Curtain Wall / Price & Performance
Similar to rival systems 65%
FS 50 Curtain Wall / Thermal Insolation
Uf: 1,46 W/m².K 46%
FS 50 Curtain Wall / Ease of Installation
Faster 85%
fs50-referances

System selection according to the project

There are a few important points to consider when choosing a system according to the project. These can help you optimize both your budget and the requirements of your project:

  1. Determining the Needs of the Project
    Clarify criteria such as the size of the project, the purpose of use, durability requirements, and aesthetic expectations. These criteria form the basis for choosing the right system.
  2. Evaluating the Technical Specifications of the System
    Compare the technical specifications of the system you are considering to the requirements of your project. For example, details such as energy efficiency, insulation properties, or ease of installation should be compatible with the project.
  3. Cost Analysis
    When choosing a system, evaluate not only the initial cost but also total costs such as long-term maintenance, energy savings, and lifespan.
  4. Price/Performance Comparison
    Determine the most suitable one in terms of price/performance by comparing existing brands and systems with similar features.

If you are undecided about choosing a system, consulting our company and receiving project-specific recommendations will be a great advantage for you. If you want us to make special recommendations for you, you can share more information about your project! 😊 Cephe@cephe.com.tr

Detail Drawings and Manufacturing Preparations

If you have a project and have already decided on the system to use, we can collaborate on site measurements, detailed project drawings, and manufacturing drafts. Partnering with us not only saves you time but also reduces costs while ensuring fast and efficient results. Plus, you’ll have peace of mind knowing your project is in expert hands.

Our Process

  1. Site Measurements (Röleve)
    We perform on-site measurements to analyze the current conditions and gather precise data. Accurate site measurements prevent potential errors in later stages.

  2. Project Detail Drawings
    Detailed technical drawings are created based on the selected system and project requirements. These drawings:

    • Optimize material selection,
    • Minimize potential issues during installation,
    • Save time during manufacturing and application processes.
  3. Preparation of Manufacturing Drafts
    We prepare all necessary manufacturing drafts to ensure seamless and error-free production. These drafts include:

    • Precise dimensions,
    • Material lists,
    • Assembly sequences and key technical details.
  4. Cost and Time Efficiency
    Professional preparation of detailed drawings and manufacturing documents reduces material waste and shortens application time. This directly lowers overall project costs.

  5. Expert Support and Confidence
    By entrusting your project to skilled professionals, you’ll benefit from a problem-solving approach throughout the process, ensuring a smoother and more secure project completion.

Why Work With Us?

  • Experienced Team: With years of industry expertise, we deliver tailored solutions for every project.
  • Fast and Reliable Service: We provide effective solutions quickly, making the most of your valuable time.
  • Cost Savings: Careful planning and execution keep your budget in check.

If you’re interested in collaborating on detailed drawings and manufacturing preparations, feel free to contact us. We look forward to working with you!  Cephe@cephe.com.tr

Production and Installation Services

Our company collaborates with various factories in production, working with more than 13 facilities. We directly manage system details and product supply to ensure the highest quality standards at every stage of our projects.

Our registered brand, CEPHE®, has been a leading name in the industry since 2006. With 27 years of experience in the production and installation of façade systems, we are dedicated to delivering the best results for your projects.

We take pride in having completed over 400 projects in 12 different countries. We look forward to being part of your next project. Please do not hesitate to contact us for further information and collaboration opportunities.   cephe@cephe.com.tr

 

blog author

CEPHE®

Author

For 27 years, there is professionalism in detail development, manufacturing and assembly for over 400 projects in 12 countries.

LANGUAGES »